IMACS Engineering Run, January 23-30, 2005
- IMACS Engineering Run, January 23-30, 2005
- Issues and Tasks
- Personnel and Observatory Support Required
- Report
Issues and Tasks
DSS Engineering and Maintenance
- mount new f/2 stop
- fit and test hartmann mask
- GTM 2 (600l grating) is not as free from wheel (Position 5) as expected when mechanism is engaged
- realign pins and blocks using FHCS
- check GTM (zero point) calibrations and recalibrate as needed
- get encoder values to create GTM load function
Science Camera Glycol Plumbing
- replace existing coolant lines with new integal hoses
- prepare plan for replacing heat exchangers
General Engineering and Maintenance
- look into reported motion problems with CF guide camera
- create troubleshooting guide
- f/2 preformance
- prepare for telescope and IMACS realignment
Personnel and Observatory Support Required
SBS
- Tyson Hare, arrives @ LCO Jan. 22, 2005 (Saturday), leaves Jan. 31, 2005.
- Alan Dressler
LCO
- David Osip
- Telescope operator
- Machinist
Report
DSS Engineering and Maintenance
Science Camera Glycol Plumbing
Other Issues and Future Work
Other Issues
Future Work
---