  1. Personnel
  2. Requirements
  3. Meetings

Personnel

TITLEPERSONDUTIES
Principal InvestigatorAlan DresslerVision and funding
Co-investigatorPat McCarthyAdvice on requirements and commissioning
Project ScientistIan ThompsonMaintains requirements document, decides scientific and engineering tradeoffs
Project EngineerTyson HareMaintains technical documentation, manages shipping and commissioning logistics
CCD ScientistGreg BurleyCCD camera electronics design and fabrication
Project ManagerAlan UomotoManage resources, reports to Council, and maintains interface control with LCO
Electronics EngineerAlan BagishMotion controls (focus)
ProgrammerChristoph BirkHigh level software interface
Electronics TechnicianJorge EstradaPCB fabrication & testing
Lead machinistVince KowalCNC programming
MachinistJerson CastilloCNC programming and machining

Requirements

ITEMREQUIREMENTJUSTIFICATIONCHANGE DATE
CCD location behind dewar reference surfacex.xxx +/- y.yyyF/2 focal plane location and focus motion limits2005-11-08
Wing chipsNoneOpen-loop flexure corrections are sufficient2006-05-13

Meetings

060712 Mosaic2

060622 Mosaic2

060515 Mosaic2

060214 Mosaic2

060117 Mosaic2

051209 Mosaic2

051108 IMACS F/2 Mosaic kickoff