Magellan Telescopes   MMTF UserPreferences
 
HelpContents FindPage Diffs Info Edit Subscribe XML Print View

Maryland-Magellan tunable filter

Information available at [WWW]http://www.ociw.edu/instrumentation/mmtf.

MOU signed and received Mar 4, 2004

We received our copy of the fully signed Carnegie-UMD memorandum of understanding for MMTF (document number 04IN0001).

Testing at SBS (Jan 23-31, 2006)

Ben Weiner reports that his tests in the lab here show that the etalon works with the new controller and he's confident that it maintains parallelism down to narrow spacings (too narrow to see rings). He did the latter test by moving the CCD camera around the beam and demonstrating that tilting the plates moved the central wavelengths.

Things to do:

  1. Build and test serial link cable to the controller
  2. Build covers for the etalon that can be installed while it's in the instrument.
  3. Build masks so that individual quadrants can be measured to test for parallelism.
  4. Install a hydrogen lamp at the telescope or on (within) IMACS.
  5. Shield the long length of cable.
  6. Test the shielded cable.
  7. Schedule pre-ship review.

Pre-ship review

Chair:

Presenters:

Reviewers:

Shipping

Other things


2006-01-31